METALOCK DTM HIGH BUILD PRIMER KIT
ML010 METALOCK is a true direct-to-metal epoxy primer designed for metal, aluminum, SMC and fiberglass. ML010 utilizes the latest technology to provide superior adhesion, outstanding corrosion protection and exceptional sanding properties creating a solid and dependable foundation for any project.
ML010 kit contains One gallon of ML011 METALOCK DTM HIGH BUILD PRIMER and one quart of MLH14 METALOCK HARDENER Handling and Application PREPARATION : Metal and Aluminum: Clean with 38373 SEM SOLVE or 38381 WORLD CLASS™ SURFACE CLEANER. Apply to 180 grit sanded or sandblasted metal or aluminum. If rust or corrosion is present, grind or sandblast until all rust and corrosion has been removed. Blow off and clean again with 38373 or 38381. SMC and Fiberglass : First, clean with 38353 PLASTIC/LEATHER PREP or 38381 WORLD CLASS™ SURFACE CLEANER. Next, sand with 180 grit sand paper. Blow off dust and re-clean with 38353 or 38381. Blow off again to ensure the surface is completely dry. NOTE : When using METALOCK as a sealer, sand the surface with nothing more aggressive than 320 grit sandpaper. MIXING : For best results, use at approximately 70°F (21°C). Thoroughly mix ML01( ) METALOCK DTM HIGH BUILD PRIMER and MLH1( )METALOCK HARDENER before use . As a HIGH BUILD PRIMER, mix by volume: 4:1 ML01( ) MLH1( ) As a PRIMER SEALER, mix by volume: 4:1:1 ML01( ) MLH1( ) SR or SRX reducer METALOCK is ready to spray once mixed and does not require an induction period. NOTE : MLH1( ) may appear yellow or darken over time. This is normal and will not affect the product’s performance. APPLICATION: Flash Time between coats: HIGH BUILD PRIMER 1.7-2.0 2 Medium 10-15 minutes PRIMER SEALER 1.3-1.5 1 Medium 10-15 minutes Air Pressure: 6-9 psi at the cap with HVLP equipment 25-45 psi for non HVLP equipment Time to Apply Body Filler: 24 hours Allow a minimum of 2 hours dry time before sanding . Allow a minimum of 1 hour before topcoating. Dry times may vary depending on film build and shop conditions. If waiting longer than 24 hours to recoat, METALOCK must be sanded with 180 grit or finer sandpaper. CLEANUP : Use appropriate cleaning materials compliant with VOC regulations in your area. STORAGE : ML01( ) METALOCK DTM HIGH BUILD PRIMER and MLH1( ) METALOCK HARDENER should be stored in a cool dry place with adequate ventilation away from heat, sparks and flames. The shelf life for ML01( ) and MLH1( ) is 3 years when stored under normal conditions.
|